KLMG Cross Road Busbar Transition Fitting

Three Tables, Three Different Products

The sheet is not one series:

  • Table 1 — 7 rows, KLMG-70/64 to KLMG-150/136, each with the tube size and a diameter.
  • Table 2 — 5 rows under a different prefix, KMGSJ, with the tube diameter but no dimensions at all and a note that the customer must supply them.
  • Table 3 — 5 rows, the Z series, KLMG-130/116Z to KLMG-250/230Z, with the tube size and nothing else.

Only the first table is a catalogue with dimensions. The other two are a made-to-order item and a size list.

The Ø Column Only Repeats The Model

Every row of table 1:

Model O.D./I.D. Ø
KLMG-70/64 70/64 70
KLMG-100/90 100/90 100
KLMG-150/136 150/136 150

The model, the tube column and the Ø column all carry the outside diameter. The Ø column adds nothing — the only information in the row beyond the model number is the inside diameter in the model itself, and from that, the wall.

Walls: 3 mm on the 70, 3 mm on the 80/74, 5 mm on the 90/80 and 100/90, 4 mm on the 120/112, 7 mm on the 130/116 and 150/136. The tube body is not dimensioned anywhere — no length, no flange, no bolt pattern, no weight.

The Same Tube Has Two Walls On This Site

Cross-check the outside diameters against the aluminium tubular busbar sheet and two of them disagree:

O.D. Bore on the busbar sheet Bore on this sheet
80 72 74
120 110 112
70 64 64
90 80 80
100 90 90
130 116 116
150 136 136

Four of the seven agree. 80/74 against 80/72 and 120/112 against 120/110 are 2 mm apart — a 3 mm wall against a 4 mm one, and a 4 mm wall against a 5 mm one.

A transition fitting clamps or sleeves the tube, so the bore has to match the tube that arrives. A 2 mm error is enough for a mismatch on site. If the project uses an 80 or a 120 tube, confirm the wall with us before the fitting and the tube are ordered on separate purchase orders — one of the two sheets is out, and this page cannot tell you which.

The Z Series Prints Nothing But The Size

KLMG-130/116Z, 150/136Z, 170/156Z, 200/180Z, 250/230Z — five rows, one column each. No Ø, no dimensions, no weight.

Two of them duplicate a plain model exactly: 130/116 and 150/136 appear both with and without the Z suffix, at the same tube size. So Z is not a size variant.

Z is a different transition geometry on the same tube size, not a finish or a material: the body is longer and the angle is cut for the run it is made for. Never order a Z model by substituting the plain one of the same tube size — send the run and the drawing states the angle.

The Z series is also the only place the larger tubes appear: 170/156, 200/180 and 250/230 are on this page and not in table 1, so for a 200 mm tube there is a Z fitting and no plain one.

KMGSJ Is A Quotation, Not A Catalogue Item

Table 2 changes prefix to KMGSJ and covers 70, 80, 90, 100 and 130 mm — it skips the 120 and 150 that table 1 has.

The dimension columns a and H are empty on all five rows, and the cell that would hold them carries a note instead: “User must provide dimensional specifications: Items (1) and (5) require current rating, terminal pad direction, and height above ground.”

So KMGSJ is a fabricated item priced after the layout is known. Three things have to come from the project before it can be quoted: the current rating, the direction the terminal pad faces, and the height above ground. The note refers to items (1) and (5) of a drawing, so the drawing is needed as well as the table.

If the job is a standard cross-road transition, table 1 is the one to order from. If the geometry is fixed by an existing structure, KMGSJ is the one that gets made to suit.

What Is Missing Across All Three

  • No weight on any of the 17 rows — nothing can be freighted or priced per kilo.
  • No bolt sizes, no flange dimensions, no terminal pad size — the three things a transition fitting is installed by.
  • No material or finish — no alloy, no galvanising specification, though the fitting is outside and carries current.
  • No current rating — which the KMGSJ note expects the customer to supply, so presumably the same applies to the rest.

Technical Parameters

KLMG Cross Road Busbar Transition Fitting Drawing KLMG Cross Road Busbar Transition Fitting Clamp KLMG Cross Road Busbar Transition Fitting Assembly

ModelTubular Busbar O.D./I.D. (mm)Main Dimension Ø (mm)
KLMG-70/6470/6470
KLMG-80/7480/7480
KLMG-90/8090/8090
KLMG-100/90100/90100
KLMG-120/112120/112120
KLMG-130/116130/116130
KLMG-150/136150/136150
ModelTubular Busbar O.D. (mm)Main Dimensions (mm)
aH
KMGSJ-7070User must provide dimensional specifications: Items (1) and (5) require current rating, terminal pad direction, and height above ground.
KMGSJ-8080
KMGSJ-9090
KMGSJ-100100
KMGSJ-130130
ModelTubular Busbar O.D./I.D. (mm)
KLMG-130/116Z130/116
KLMG-150/136Z150/136
KLMG-170/156Z170/156
KLMG-200/180Z200/180
KLMG-250/230Z250/230

KLMG Cross Road Busbar Transition Fitting Detail KLMG Cross Road Busbar Transition Fitting Terminal KLMG Cross Road Busbar Transition Fitting Installation KLMG Cross Road Busbar Transition Fitting Application

The tubes these transition from: aluminum tubular busbar. Spacers and supports for the same tubes: JS double busbar spacer, YH composite busbar ring. Setting-out of a complete busbar run: tubular busbar fittings schematic.

Note: Seventeen models in three tables. In table 1 the Ø column repeats the outside diameter that is already in the model, so the bore is the only new information; no length, flange, bolt pattern or weight is printed anywhere. The 80 mm tube prints bore 74 here against 72 on the busbar sheet, and the 120 mm prints 112 against 110 — a 2 mm wall difference on two sizes, which matters because the fitting clamps the tube. The Z series has no dimensions and no stated meaning, and duplicates 130/116 and 150/136 at the same size. Table 2 changes prefix to KMGSJ, covers five sizes only, and requires the current rating, terminal pad direction and height above ground from the customer before quotation.

Sizing data behind this page

A tubular busbar fitting is matched to the tube's outside diameter and wall, not to a conductor area. The twelve tubes are specified outside over inside in millimetres — 70/64 through 300/276 — and the wall, section, stiffness and current rating that follow from each are in: