JYB Splicing Sleeve Aluminum Strand Explosive Compression

Models: JYB-70/40 – JYB-500/65 · Conductor: LGJ-70/40 – LGJ-500/65 · Reference Weight: 0.35–2.21 kg

JYB Splicing Sleeve (Aluminum Strand) (Explosive Compression)

Two Tubes, Not One

The drawing shows two separate parts, and this is the first thing to understand about the sheet:

  • A long outer tube — length L, outside diameter D, bore d.
  • A short inner tube — length L1, outside diameter D1, bore d1.

Every row prints both sets. That means this is a two-stage splice: an inner sleeve goes on first, then the outer sleeve over it, and both are compressed.

It also means the sheet has eight columns of dimensions where the single-piece JTB has five. If you are comparing the two pages by column count, that is why.

The outer tube carries the weight. Across the nineteen rows the inner tube contributes roughly 5 to 20 % of the total mass — the outer sleeve is the part you are buying.

L1 Is About A Quarter Of L, Except At The Start

For fifteen of the nineteen rows, L1 falls between 0.24 and 0.31 of L — the inner tube is a quarter to a third of the outer length. That is a stable design ratio.

Three rows break it badly:

Model L L1 L1 / L
JYB-70/40 410 240 0.59
JYB-95/55 430 150 0.35
JYB-120/70 340 160 0.47

JYB-70/40’s inner tube is longer than half the outer tube — 240 mm against a norm that would put it near 110 mm. Its nearest neighbours by conductor are the 95/55 and 120/70, both also high.

These three are the large-steel conductors at the bottom of the range, so the longer inner tube may be deliberate: more steel to grip, more sleeve to do it with. But the ratio never appears again anywhere in the range, so treat the first three rows as a separate design rather than as points on the same curve as the rest.

The Inner Tube Does Not Fit The Outer On JYB-150/25

An inner tube has to pass inside the outer bore. Check D1 against d on every row and eighteen of them are fine — D1 is 2 to 10 mm smaller than d, as it should be.

JYB-150/25 prints D1 = 26.0 and d = 18.0. The inner tube is 8 mm wider than the hole it is supposed to go into.

That pair cannot be built as the row reads: the inner tube belongs to a different size from the outer. JYB-150/25 is therefore quoted from the drawing pair, and the two tubes, the length and the weight are confirmed against it before the order is booked.

The same row is also the lightest in the range at 0.35 kg, and the outer tube on its own — 320 mm of 30 mm tube with an 18 mm bore — already weighs about 0.39 kg in aluminium. The 0.35 kg on that row is the tube, not the assembly — the outer sleeve alone comes to 0.39 kg — so the assembly weight comes with the drawing.

Two independent checks fail on the same row. Treat JYB-150/25 as undocumented until we confirm it.

d1 Does Not Track The Steel Core

The inner tube is presumably there to grip the steel core, so d1 should follow the steel area. It does not:

Model Steel area d1
JYB-300/20 20 mm² 9.8
JYB-300/25 25 mm² 18.5
JYB-300/40 40 mm² 17.0

Three sizes of the same 300 mm² conductor, and the inner bore goes down as the steel goes up. A 40 mm² core would not fit an 18.5 mm bore and would rattle in the 9.8 mm one — neither ordering makes sense.

So d1 is not the steel-core bore, or the column is not reliable. The catalogue gives no legend for it either way. If your design depends on the inner sleeve matching the core, send us the conductor designation and we will specify the sleeve from the drawing rather than from this table.

Lengths And Grip

L runs 320 to 560 mm and L1 85 to 240 mm. The spread in L is narrow — under 2 : 1 across a conductor range from 70 mm² to 500 mm² — because the explosive process compresses the whole sleeve at once and does not need length to build up grip.

Grip runs 51 to 163 kN, and for the six heavy-steel conductors it matches the JTB figures exactly: 55.4 for 70/40, 74.2 for 95/55, 98.7 for 400/35, 162.8 for 400/95. The two-piece and one-piece explosive sleeves are rated the same, so the choice between them is about the conductor and the tooling, not about strength.

Technical Parameters

JYB Splicing Sleeve Aluminum Strand Explosive Compression Engineering Drawing JYB Splicing Sleeve Aluminum Strand Explosive Compression Technical Drawing

ModelApplicable Conductor(mm2)Main Dimensions(mm)Grip Strength(kN)Reference Weight(kg)
LDdL1D1d1
JYB-70/40LGJ-70/404103222.024020.08.855.40.80
JYB-95/55LGJ-95/554303825.015024.019.074.20.92
JYB-120/70LGJ-120/703403625.516025.019.093.50.92
JYB-150/25LGJ-150/253203018.08526.012.051.40.35
JYB-185/25LGJ-185/253303220.49017.211.256.50.86
JYB-185/30LGJ-185/303503220.010017.513.561.10.80
JYB-240/30LGJ-240/304303623.313021.213.271.90.95
JYB-240/40LGJ-240/404503623.513021.313.379.20.97
JYB-240/55LGJ-240/555303824.016022.016.597.01.08
JYB-300/20LGJ-300/204204025.010014.09.871.91.07
JYB-300/25LGJ-300/254303625.511023.418.579.31.10
JYB-300/40LGJ-300/404304025.511022.017.087.61.00
JYB-300/50LGJ-300/504504026.012022.017.098.31.01
JYB-300/70LGJ-300/705104227.015024.019.0121.61.35
JYB-400/35LGJ-400/355304528.515026.015.098.71.74
JYB-400/50LGJ-400/505104529.513024.017.0117.31.80
JYB-400/65LGJ-400/655204829.514026.021.0128.51.90
JYB-400/95LGJ-400/955504831.017028.022.0162.82.10
JYB-500/65LGJ-500/655605232.514024.019.0146.32.21

The one-piece explosive sleeve: JTB. The mechanical equivalents: JT for ACSR, JT-L for all-aluminium. Repair sleeves: JX.

Note: Two tubes per splice — outer L/D/d and inner L1/D1/d1. L1 is a quarter to a third of L on fifteen rows, but 0.59 on JYB-70/40. JYB-150/25 prints an inner tube (D1 26) wider than the outer bore (d 18) and a weight below its own outer sleeve; do not order that size without confirmation. d1 does not track the steel area — on the 300 mm² sizes it falls as the steel grows.